The initial project basis is a 5 KLD grain-based ENA plant with integrated DDGS recovery and an engineered pathway to 10 KLD.
Nominal ENA production basis for the first operating configuration.
Layout and utility planning consider a controlled future capacity increase.
Compact industrial site planning basis, subject to final plot verification and engineering.
| Area | Planning basis |
|---|---|
| Feedstock | Broken rice primary; maize flexibility |
| Product | ENA, planned at 96% v/v basis |
| Co-product | DDGS through solids recovery, evaporation and drying |
| Utilities | Biomass/rice-husk boiler, cooling, compressed air, water treatment, electrical systems |
| Environment | MEE/ZLD concept, condensate recovery, CPU/ETP and responsible residue handling |
| Location basis | CSIDC Industrial Area Selar, Bilaspur — subject to land confirmation |